World Bank · Private Sector

Colombia: Time required to obtain an operating license

39.35days · 2023

The average wait, in days, to obtain an operating license, from the day of the application to the day it was granted. Annual figures for Colombia from 2006 to 2023.

20062023

Every year

YearValue (days)Note
202339.349
201745.069
201025.596
200628.205

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-22.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time required to obtain an operating license. Interva. https://interva.co/dataset/worldbank-time-required-to-obtain-an-operating-license (accessed 2026-11-24). catalog snapshot 2026-11-22.