World Bank · Energy

Azerbaijan: Time to obtain an electrical connection

13.86days · 2024

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Azerbaijan from 2002 to 2024.

20022024

Every year

YearValue (days)Note
202413.862
20194.629
20133.585
20099.672
20052
20027.3

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-08). catalog snapshot 2026-11-07.

CSV, all countriesJSON, AzerbaijanAPI and MCP

Time to obtain an electrical connection in other countries

Rank Azerbaijan against its region, see where publishers disagree, or ask a question in plain words on the Interva desk.

Azerbaijan: Time to obtain an electrical connection (2002–2024) · Interva