Equatorial Guinea: Time to obtain an electrical connection

37.87days · 2024

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Equatorial Guinea from 2024 to 2024.

Every year

YearValue (days)Note
202437.874

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-08). catalog snapshot 2026-11-07.

CSV, all countriesJSON, Equatorial GuineaAPI and MCP

Time to obtain an electrical connection in other countries

Rank Equatorial Guinea against its region, see where publishers disagree, or ask a question in plain words on the Interva desk.

Equatorial Guinea: Time to obtain an electrical connection (2024–2024) · Interva