World Bank · Energy

Spain: Time to obtain an electrical connection

58.36days · 2024

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Spain from 2005 to 2024.

20052024

Every year

YearValue (days)Note
202458.358
202132.137
20059.3

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-07). catalog snapshot 2026-11-07.