World Bank · Energy

Eswatini: Time to obtain an electrical connection

53.59days · 2024

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Eswatini from 2006 to 2024.

20062024

Every year

YearValue (days)Note
202453.589
201611.312
200616.856

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-08). catalog snapshot 2026-11-07.

CSV, all countriesJSON, EswatiniAPI and MCP

Time to obtain an electrical connection in other countries

Rank Eswatini against its region, see where publishers disagree, or ask a question in plain words on the Interva desk.

Eswatini: Time to obtain an electrical connection (2006–2024) · Interva