Nicaragua: Time to obtain an electrical connection

31.03days · 2016

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Nicaragua from 2006 to 2016.

20062016

Every year

YearValue (days)Note
201631.028
201024.74
200662.713

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-22.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-24). catalog snapshot 2026-11-22.