Maldives: Time to obtain an electrical connection

22.57days · 2025

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Maldives from 2025 to 2025.

Every year

YearValue (days)Note
202522.575

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-08). catalog snapshot 2026-11-07.