Botswana: Time to obtain an electrical connection

40.42days · 2023

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Botswana from 2006 to 2023.

20062023

Every year

YearValue (days)Note
202340.42
201039.212
200625.459

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-07). catalog snapshot 2026-11-07.

CSV, all countriesJSON, BotswanaAPI and MCP

Time to obtain an electrical connection in other countries

Rank Botswana against its region, see where publishers disagree, or ask a question in plain words on the Interva desk.

Botswana: Time to obtain an electrical connection (2006–2023) · Interva