Nigeria: Time to obtain an electrical connection

24.74days · 2025

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service. Annual figures for Nigeria from 2007 to 2025.

20072025

Every year

YearValue (days)Note
202524.737
20149.351
20077.508

Source

Published by World Bank, produced by World Bank. Licence: CC BY 4.0. Retrieved 2026-11-07.

The dataset for every country, with quality and provenance →

Cite or download

World Bank (2026). Time to obtain an electrical connection. Interva. https://interva.co/dataset/worldbank-time-to-obtain-an-electrical-connection (accessed 2026-11-08). catalog snapshot 2026-11-07.